Connect with us

%

34 Málaga Towns Face Severe Earthquake Risk Under Spain’s New Warning Guide

Published

on

34-malaga-towns-face-severe-earthquake-risk-under-spain’s-new-warning-guide

The classification uses the European Macroseismic Scale. Photo credit: Sebastian_Photography/Shutterstock

Residents in Málaga province could be living in areas where earthquake shaking capable of severely damaging buildings is considered possible. A new national civil protection guide places 34 municipalities in the province in its highest seismic hazard category, while requiring all 103 local councils to prepare plans for dealing with an earthquake.

The updated directive now replaces the previous framework dating from 1995. It is based on seismic hazard studies by Spain’s National Geographic Institute (IGN) and establishes the requirements local authorities must follow when preparing for a possible earthquake.

Which Málaga towns are on the highest-hazard list?

The 34 municipalities identified in the classification are concentrated mainly in the Axarquía, around Antequera and in Málaga city itself. Several are popular with British residents and other international homeowners, particularly along the eastern Costa del Sol.

The official list includes:

  • Málaga city: Málaga.
  • Axarquía and eastern Costa del Sol: Nerja, Torrox, Vélez-Málaga, Algarrobo, Frigiliana, Cómpeta, Canillas de Aceituno, Canillas de Albaida, Alcaucín, Almáchar, Benamargosa, Árchez, Arenas, Cútar, El Borge, Periana, Riogordo, Salares, Sayalonga, Sedella and Viñuela.

Northern and inland Málaga: Antequera, Archidona, Alfarnate, Alfarnatejo, Casabermeja, Colmenar, Comares, Villanueva de Algaidas, Villanueva de la Concepción, Villanueva de Tapia, Villanueva del Rosario and Villanueva del Trabuco.

The inclusion of both coastal resorts and inland villages means the classification is relevant beyond the province’s busiest tourist destinations. Residents in smaller communities are also covered by the updated planning requirements. Marbella, Fuengirola, Benalmádena, Torremolinos and Estepona do not appear in this highest-hazard category. Their exclusion from the list of 34 does not mean they are exempt from earthquake preparedness, as the wider requirements apply across the province.

What must Málaga’s councils do?

All 103 municipalities must prepare and implement local earthquake response plans within a maximum of four years. These plans must establish how councils would coordinate emergency services, assess building damage, communicate with residents and organise assistance if a significant earthquake occurred. They must also consider evacuation arrangements, available resources and cooperation with neighbouring municipalities.

Smaller councils may use simplified plans under the directive, while provincial authorities can provide technical assistance. The aim is to ensure local administrations have practical arrangements in place before an emergency happens, rather than having to organise a response from scratch. For residents, the effectiveness of these preparations will depend on how clearly responsibilities are defined and how well the relevant services coordinate their work. Public information and arrangements for helping people who may need additional assistance are also important parts of local emergency planning.

What does the classification mean for homeowners?

Being included in the highest-hazard category does not mean every property in a municipality is equally vulnerable. The age, construction and condition of individual buildings can affect how they withstand earthquake shaking. The classification identifies areas where the possibility of more severe shaking must be considered when planning emergency responses. It does not predict when an earthquake will happen or establish that a particular property is unsafe.

The directive also places responsibility on local authorities to turn the updated classification into practical emergency arrangements. Residents can consult the official documentation to understand the requirements applying to their municipality and follow updates from their local council.

Local authorities must use the updated classification to prepare for a potential earthquake, including how they would alert the public, coordinate emergency responders, assess damaged buildings and protect people who may need assistance. For Málaga residents, the four-year deadline gives municipalities a defined period to organise their response, identify the resources they would need and establish how they would protect their communities if damaging earthquake shaking occurred.

%

Mijas Sows 33,000 Super Seed Balls

Published

on

mijas-sows-33,000-super-seed-balls

Mayor Ana Mata sowing superseeds. Credit: Ayto

Mijas distributes 33,000 super-seeds across its Sierra to regenerate plant life scorched by wildfires and combat creeping desertification.

In a hands-on bid to reverse decades of environmental damage, the Spanish town of Mijas has distributed more than 33,000 “supersemillas” across its Sierra, aiming to regenerate plant life scorched by wildfires and threatened by creeping desertification.

The plan, led by the Ayuntamiento de Mijas in partnership with the local firm Exploramás, relies on a centuries-old Japanese technique known as nendo dango. Volunteers crafted small balls of clay, natural fertilizer, substrate and meadow seeds. Once scattered on the ground, the clay casing shields the seeds from birds, wind and sun until rainfall gradually dissolves it, allowing germination without any need for planting or irrigation. A similar nendo dango approach has already been used on the Costa del Sol dunes.

Deployment of seeds follows successful experiments

The second phase of the project saw the seed balls dispersed around the former Los Arenales quarry near Mijas Pueblo and in the Hipódromo area, zones still recovering from recent fires. The effort builds on an earlier workshop held between 20 and 21 October at Cortijo Don Elías, where roughly 700 residents, students and association members rolled the balls by hand. Participants included pupils from the Las Lagunas, Sierra de Mijas, Torre Almenara and Villa de Mijas institutes, students from Kampus Formación, and members of the Fuenmijas Parkinson’s association and Afesol.

Organisers had originally planned for 27,000 seed balls; the final tally exceeded 33,000, a figure chosen in part to symbolically represent the workforce of General Electric, which supported the social action through Exploramás.

Mayor Ana Mata takes part

Mayor Ana Mata joined Environment Councillor Marco Cortés and Education Councillor Juan José Torres for the distribution. She described the Sierra’s recovery as a collective responsibility and stressed that involving schools, associations and businesses turns a practical restoration project into broader environmental education. This latest action continues broader volunteer-led efforts to revive the fire-damaged forests of the Sierra de Mijas.

“When administrations, companies, young people and social groups work together, we achieve results that go far beyond a single environmental action,” Mata said. “We are also teaching values and respect for nature.”

By combining traditional low-tech methods with broad community participation, Mijas is betting that a few tens of thousands of carefully made seed balls can help tip the balance toward greener slopes and greater resilience against the Mediterranean’s intensifying dry spells.

Continue Reading

%

US Flights Resume After Nationwide Ground Stop But Travellers Still Face Delays

Published

on

us-flights-resume-after-nationwide-ground-stop-but-travellers-still-face-delays

Los Angeles LAX brought to standstill. Credit: Rosemarie Mosteller – Shutterstock

Travellers flying between Europe and the United States on Saturday, 14 November, should check their flight status before leaving for the airport. US departures began to resume on Friday after the Federal Aviation Administration lifted a nationwide ground stop, but US Transport Secretary Sean Duffy warned that schedules would take time to recover. Passengers connecting through a US airport should check both legs of their journey.

The FAA halted departures across the United States on Friday, 13 November, after communications problems affected several regional air traffic control centres. The stop lasted more than four hours. Hundreds of flights were diverted, and more than 11,000 US flights were delayed or cancelled on Friday, according to FlightAware figures reported by The Guardian.

The disruption reached Europe on Friday night. British Airways cancelled its 10.30pm flight from Heathrow to New York. Passengers travelling between Spain and the United States should check directly with their airline for the latest departure time and any changes to onward connections.

Duffy attributed the outage to an overload in ageing communications equipment. Friday’s halt was the first nationwide ground stop since January 2023, when a separate FAA computer system failure led the agency to pause departures across the country.

The @FAAnews issued a nationwide ground stop for all U.S. airports following a communication issue impacting all Air Route Traffic Control Centers. FAA technicians are investigating the issue. We will provide immediate updates as we have them.

— Secretary Sean Duffy (@SecDuffy) November 13, 2026

Sign up for personalised news

Subscribe to our Euro Weekly News alerts to get the latest stories into your inbox!

By signing up, you will create a Euro Weekly News account if you don’t already have one. Review our Privacy Policy for more information about our privacy practices.

Continue Reading

%

Mercedes Freezes Spending & Weighs Factory Closures

Published

on

mercedes-freezes-spending-&-weighs-factory-closures

Mercedes production line. Credit: Alexander Gafarro – Shutterstock

Mercedes freezes all new spending at German plants and weighs factory closures after stalled labour talks, high costs and a sharp drop in China sales.

Mercedes-Benz has stopped every further investment at its German factories and is now checking which sites it can still keep open. Production chief Michael Schiebe told staff in an internal interview that the board had “jointly decided to halt all further investments in our German locations” because current costs make new spending impossible.

Labour director Britta Seeger said a quick deal with the works council and IG Metall looks unlikely. She added that the company must examine “concretely and in detail which locations we can still afford in Germany” and that plant closures would now have to be looked at more seriously, even though management wants to avoid them.

Why the investment freeze has happened now

Talks over cutting labour costs have dragged on for months without progress. Mercedes wants longer working hours without extra pay and other productivity steps so German plants can compete. Schiebe pointed out that an hour of production work in Germany can cost up to five times as much as at Eastern European sites. CEO Ola Källenius has used a simple cost index to show the gap: Germany at 100, the United States around 80, Hungary at 30, Romania at 20 and China between 10 and 20.

Without an agreement, future models could be built only outside Germany. Existing projects already under way will continue for the moment.

China weakness and wider industry pressure

Falling sales in China have made the cost problem harder to ignore. Deliveries there dropped by roughly 30 per cent in recent quarters as luxury demand cooled and local Chinese brands offered cheaper electric cars. Mercedes has already cut its full-year profit guidance for the cars division to 2–3 per cent and launched a wider savings programme.

Tariffs, price pressure and high energy costs in Europe have added to the strain. The German auto industry as a whole has shed tens of thousands of jobs over the past year. Suppliers such as Bosch have also cut hours and pay for thousands of workers, while Volkswagen is locked in its own tough talks over possible plant closures.

European plants outside Germany are not affected

Mercedes plants in other European countries are not covered by the freeze. The company’s expanded factory in Kecskemét, Hungary, and the van plant in Vitoria-Gasteiz, Spain, continue as normal and have received recent investment. Management has made clear that lower-cost European sites remain part of its production plans.

No specific German factory has been named for possible closure yet. Workers at sites including Sindelfingen, Rastatt, Bremen and several powertrain plants now face months of uncertainty while talks continue. IG Metall has rejected the company’s demands and plans further warning strikes.

Mercedes still says it prefers a negotiated solution, but the investment stop shows how far the company is prepared to go if German costs stay high. Readers in Spain who follow the European car industry can track further developments on the Euro Weekly News site, including earlier coverage of German job losses and the latest EU moves on petrol and diesel cars.

Continue Reading
Advertisement
Advertisement

Spanish Real Estate Agents

Tags

Trending

Copyright © 2017 Spanish Property & News